Lisa Davenport - Mechanical Engineer Resume Simple
SUMMARY
To obtain a position in the field of engineering and engineering field. I have a strong background in electrical and mechanical design, and project management.
SKILLS
  • operations, packaging, wireless, engineering, coding, analysis, test, assembly, injection molding, validation, pcb, machining, mechanical, manufacturing, production, lean, dfm
  • test, injection molding, assembly, packaging, monitoring, process control, technology, routing, machining, prototype, electrical, collection, testing, reports, solid works, design, printing, pcb, wiring, manufacturing, production, marketing, data collection
WORK EXPERIENCES
  • 2017-12-252017-12-25

    Mechanical Engineer

    Ohio Northern University

    • Calibration and inspections of equipment and mechanical test equipment. Provide technical support to field technicians and suppliers. Prepare and maintain BOM and bill of materials.
    • Coordinate and manage engineering, manufacturing, and production operations. Responsible for the analysis of equipment and calibration of equipment and supplies.
    • Assembly of equipment and fabrication equipment, calibration, and validation. All the mechanical assemblies. The electrical schematics, and test inspections.
    • Assisted in the development of electrical schematics, CAD drawings, and HVAC equipment. Supervised the fabrication of the test lab.
    • Worked with RF engineers to ensure BOM is available for the fabrication and commissioning of equipment. Provided technical support to field technicians.
    • Worked with RF engineers to ensure BOM is available for fabrication and installation. Prepared and presented the final control of the BOM.
  • 2017-12-252017-12-25

    Contract Mechanical Engineer

    Wegman'S

    • Developed and implemented a prototype of the inspection system to provide a safety of the electrical and mechanical systems to the laboratory.
    • Responsible for the design and maintenance of the GSM lighting control system, including the creation of a new test environment, and the installation of a new equipment.
    • O developed a new inspection system to track the inspection of the equipment and the fabrication of the assembly of the equipment.
    • Managed the installation of a new pipeline to include electrical, HVAC, and safety inspections. This included the creation of a new facility, and the maintenance of the equipment.
    • Developed a new pipeline for the installation of a new inventory system to allow the company to be used by the plant to ensure that the equipment is in place to perform the maintenance of the manufacturing plants.
    • Developed a new site to manage the fabrication and maintenance of equipment and supplies to ensure the highest level of inventory and safety.